Biomass Installation

Ashdown Forest

Biomass Installation in Ashdown Forest

Installation of a new biomass boiler and a complete overhaul of the old heating system with the installation of new radiators throughout the Ashdown Forest Centre.


  • Ashdown Forest, Sussex
  • Froling S4 60 Log burning boiler (60KW)
  • 4,000 ltr Buffer storage vessel(s)
  • Total cost £21,538.88 +VAT