A less challenging project compared with some of most recent installations – but very enjoyable nevertheless.
This property although fairly new in construction was heated using LPG. The customer’s heating system failed and it was time for change – due to the ever rising costs of LPG.
By using the existing central heating system we were able to install a new highly efficient cylinder to work with a Heat Pump and 1 x Mitsubishi Ecodan 14kW.
We ensured the maximum amount of insulation was carried out prior to the installation and had to produce a full planning application – which received backing from the local Authority. This system is currently on target to save the customer over 40% on their previous heating bill.